February 9 2024
Summary:
A new washroom building has been delivered to George Little Park and is awaiting connection to power, water, and sewer. It is expected to be operational within days, offering closer access to the playground and splash park area. Each unit contains a baby-changing table and is considered unisex. The building, funded by grants from Terrace Community Forest and Pacific Economic Development Canada, includes a drinking fountain with a water bottle filler. The installation also involves creating a direct pathway from the splash park.